PRODUCTS

Location:
Workshop introduce DNV2.7-1 Offshore container
2025-07-09
Workshop introduce DNV2.7-1 Offshore container

Winner Offshore's workshop focused on the two core aspects of intelligence and greenization, and grandly launched a new generation of intelligent offshore container systems. This system integrates Internet of Things and artificial intelligence technologies, enabling real-time monitoring of equipment status, fault early warning and remote operation and maintenance. It can improve operational efficiency by 40% and has obtained certifications from authoritative institutions such as DNV (Det Norske Veritas) and BV (Bureau Veritas).

The low-carbon offshore equipment unveiled at the same time adopts lightweight materials and new energy technologies, reducing carbon emissions by 60% compared with traditional products, which meets the needs of sustainable development of the global marine industry.

As a benchmark enterprise in service-oriented manufacturing, Winner Offshore elaborated on the "customized R&D + full-cycle service" model. By deeply participating in the entire process of customers' projects, it provides integrated solutions from scheme design to after-sales operation and maintenance.

Winner Offshore will continue to promote industrial upgrading through technological innovation and contribute to the efficient and safe development of marine engineering.

General specification

• Customized dimension

• Gross Weight : up to 25,000[kg], dependent upon Size & Layout

• Area: Zone 1 & Zone 2 & Safe area

• Fire Rating: A60

• Design and build any kinds of engineering workshops, such as welding and mechanical workshop, E&I workshop, tool store workshop, equipment store container and so on.

Certification Regulation Options Available

• DNVGL 2.7-1/ISO 10855

• ATEX & IECEx Certified Equipment

• IMO Regulations MODU Code 2001 Edition (FTP Compliant)

• International Conference on Safety of Life at Sea (SOLAS) 2009

• DNVGL 2.7-2 (Optional)

• IEC60079-13 2010 (Optional)

Options

• Approved by DNV, ABS, LR,CCS, etc. (As required)

• Over-pressure system can be used in hazardous area • CPFG control system with PLC

• Fitted with Dedicated Air Conditioning System, Venti1ation & Heating (HVAC System)

• Stand Alone, Digitally Controlled Shutdown System

• Protected with Fire and Gas Detection

• Automatic Fire Dampers (Fail safe)

• Emergency alarm system

Project Scope

• Design, validation/approval, manufacture, testing, certificate

• 2--3 months from request to deliver

Previous page:No data
Next page:No data

MESSAGE

Submit